Search Site

This search form uses an instant search feature. As you type, search results will appear automatically below the search field. When you've entered you desired search terms use tab to navigate through the available results and hit enter to open the selected page or document.
SCHOOL CONSTRUCTION
SCHOOL CONSTRUCTION
Lori Smet
Friday, December 11, 2020

STARTING ON MONDAY, DECEMBER 14TH, WE WILL BE IN A NEW PHASE OF CONSTRUCTION.  THE AWNING TO THE ELEMENTARY SCHOOL WILL BE TORN DOWN.  AS A RESULT, THERE WILL BE NO ACCESS TO THE FRONT OF THE ELEMENTARY SCHOOL.  IF YOUR CHILD IS A PICK UP, HE OR SHE MUST NOW BE PICKED UP FROM OUR PICK UP LINE.  PLEASE DO NOT PICK YOUR CHILD UP EARLY UNLESS WE HAVE CALLED YOU OR  IT IS ABSOLUTELY NECESSARY.  ALSO STARTING ON  MONDAY, DROP OFFS AND BUSES WILL UNLOAD AND ENTER THE SCHOOL THROUGH THE SIDE DOOR LEADING INTO THE HIGH SCHOOL.  IT IS VERY IMPORTANT THAT YOUR CHILD GET TO SCHOOL ON TIME.  AFTER 8:00, THERE WILL NOT BE FACULTY OR STAFF THERE TO HELP THEM GET INSIDE.  THANK YOU FOR YOUR CONTINUED PATIENCE AS WE MAKE IMPROVMENTS TO OUR SCHOOL.